Coca-Cola Project Highlights

73,500+ SQUARE FEET
With more than 11 roof sections, Complete Commercial Roofing has been working side-by-side with Coca-Cola to replace all the roofs on this bottling plant. Over the course of the past two and a half years, we have worked diligently to make this building watertight.

The problematic roof areas were plentiful. After numerous repairs over the course of several years, the life cycle of the roof had come to an end.

With regards to the most recent sections completed, CCR installed a new Duro-Last 40 mil system directly over their previous built-up roof system. In addition, new parapet wall flashings, pipe flashings, curb flashings, roof vents, fascia as well as gutters and downspouts were replaced.

Coca-Cola got much more than just a brand new roof system. The standard 15-Year No Dollar Limit (NDL) Warranty is transferable, has no exclusions for ponding water, and provides coverage against consequential damages that result from material defects and Complete Commercial’s installation of Duro-Last products.

What does that mean? It’s a no-worry roof system. 

 

 

©2020 Complete Commercial Roofing Inc.